• Working Temperature: 0 to 70 °C
• Maximum Working Pressure: 145 PSI (23 °C) • 100 PSI (70 °C)
• Size: 18 I.D.
• Size: 22 O.D.
• Length: 4 m
• Length: 13 ft
• Weight: 0.60 kg
Material(s):
• Polyamide 12 (PA12), self extinguishing
• Available in 3 different pipe sizes: 15 mm (1/2 in), 22 mm (3/4 in) and 28 mm (1 in)
• Low friction for high flow
• Prevent the formation of rust
• Lightweight for ease of manipulation
• Calibrated pipes for leakproof connections
• The AIR LINE system is approved for installation as a compressed air distribution system by the RBQ (Régie du Bâtiment) and meets UL Norm 94 V2 requirements
INSTALLATION TIP
It is important to install the main air line with a slight slope of about 25 to 50 mm every 30 meters
These slopes should lead to drainage points at different locations (manual or automatic drains installed as low as possible)
HOW IT WORKS
Condensates remain in the main line
Only compressed air can go into the drop
Workshops, garages, manufacturing plants and vacuum applications
• Working Temperature: 0 to 70 °C
• Maximum Working Pressure: 145 PSI (23 °C) • 100 PSI (70 °C)
• Size: 18 I.D.
• Size: 22 O.D.
• Length: 4 m
• Length: 13 ft
• Weight: 0.60 kg
Material(s):
• Polyamide 12 (PA12), self extinguishing
• Available in 3 different pipe sizes: 15 mm (1/2 in), 22 mm (3/4 in) and 28 mm (1 in)
• Low friction for high flow
• Prevent the formation of rust
• Lightweight for ease of manipulation
• Calibrated pipes for leakproof connections
• The AIR LINE system is approved for installation as a compressed air distribution system by the RBQ (Régie du Bâtiment) and meets UL Norm 94 V2 requirements
INSTALLATION TIP
It is important to install the main air line with a slight slope of about 25 to 50 mm every 30 meters
These slopes should lead to drainage points at different locations (manual or automatic drains installed as low as possible)
HOW IT WORKS
Condensates remain in the main line
Only compressed air can go into the drop
Workshops, garages, manufacturing plants and vacuum applications